Bathroom Renovation Checklist

A complete, ordered checklist for a bathroom remodel — planning, demo, rough-in, waterproofing, tile, fixtures and finishing — so nothing gets done out of sequence.

Updated June 4, 2026

A bathroom is the most plumbing- and waterproofing-intensive room in the house, which is exactly why order of operations matters so much. Get the sequence right and the project flows; get it wrong and you're tearing out fresh tile to fix a pipe. Use this checklist to plan, buy, and schedule a full gut-and-replace.

1. Plan and design

  • Decide whether the layout stays the same or fixtures move (moving plumbing adds cost and usually a permit).
  • Choose your tile, vanity, toilet, fixtures, and lighting early — lead times can be weeks.
  • Set a budget with a 10–20% contingency for the surprises hidden behind old walls.
  • Check local permit requirements for any plumbing, electrical, or structural changes.

2. Demolition

  • Shut off water and power to the room before you touch anything.
  • Remove fixtures, vanity, flooring, and tile down to the studs and subfloor where needed.
  • Inspect for water damage, rot, or mould and address it before rebuilding.

3. Rough-in (plumbing & electrical)

  • Run or relocate supply lines and drains for the new layout.
  • Add or move wiring for lighting, outlets (GFCI), heated floors, and the exhaust fan.
  • This is the time for inspections if your permit requires them — before walls close up.

4. Walls, waterproofing & backer board

  • Insulate exterior walls, then hang moisture-resistant drywall on non-wet areas. Estimate sheets and compound with the Drywall Calculator.
  • Install cement backer board in wet areas (shower, tub surround).
  • Apply a waterproofing membrane to the shower/tub area and let it cure fully — this is the single most important step for a lasting bathroom.

5. Tile

  • Plan your layout lines from the centre so cut tiles land symmetrically at the edges.
  • Set floor and wall tile in thinset, let it cure, then grout and seal.
  • Get exact tile counts plus thinset, grout, spacers, and backer board from the Tile Calculator.

6. Paint

7. Fixtures & finishing

  • Install the vanity, sink, faucet, toilet, and shower/tub hardware.
  • Hang lighting, mirror, towel bars, and accessories.
  • Caulk all wet joints, test for leaks, and run the exhaust fan to confirm airflow.

Keep it organized

A bathroom remodel has a lot of moving parts and dependencies. Track each phase as a card on the free kanban board — there's even a ready-made "Bathroom Renovation" template that pre-fills these tasks so you can move them from Planning to Done as the job progresses.

Get your materials list

Frequently asked questions

What is the correct order of work for a bathroom renovation?+

Work from the structure outward: demolition, then plumbing and electrical rough-in, then insulation and moisture-resistant drywall/backer board, then waterproofing, then floor and wall tile, then paint, then fixtures (toilet, vanity, sink, faucet), and finally trim and accessories. Roughing in plumbing and electrical before you close up the walls is the step DIYers most often get out of order.

How long does a bathroom renovation take?+

A straightforward DIY bathroom remodel commonly runs two to four weeks of working time, largely because of drying and curing: waterproofing, thinset, and grout each need time to cure before the next step. Booking trades (plumber, electrician) and material lead times can stretch the calendar further, so build slack into your schedule.

Do I need a permit to renovate a bathroom?+

A cosmetic refresh (paint, a new vanity, swapping a faucet) usually does not need a permit, but moving plumbing or electrical, altering walls, or changing the layout typically does. Permit rules vary by municipality, so check with your local building department before starting work that changes plumbing, wiring, or structure.

How much tile do I need for a bathroom?+

Measure each surface you are tiling (floor, and each wall or shower area) in square feet, then add a waste allowance — about 10% for a straight layout in a square room, and 15–20% for diagonal layouts or lots of cuts. The Tile Calculator totals your areas and also gives the thinset, grout, and backer board to go with the tile.

What should I budget for first in a bathroom remodel?+

Prioritise the things hidden behind the walls — plumbing, electrical, and proper waterproofing — because fixing those later means tearing out finished surfaces. Spend on quality waterproofing and a reliable exhaust fan before splurging on visible upgrades.